If the rollers are in the status below, raise left support 2 and right support 2.
•
Phase 3: End of platform bearing: It is recommended that the Pack is placed stably
and evenly on the platform as shown below.
step 7 Hoist and move the Pack: Fix the slings to the crane hook by top safety clips to lift and move
the Pack.
The PACK shall not be lifted by 1.5m higher than the ground to avoid falling.
step 8 Push in a new PACK.
1
Status confirmation: After the new PACK is landed on the platform surface, check
whether the PACK is aligned with the container, which can be confirmed by the guide
block at the end of the PACK. If the Pack is not aligned with the container door, lift and
adjust the Pack position, as shown below.
4 Common Maintenance Operations
Operation & Maintenance Instruction
Содержание ST2752UX
Страница 2: ......
Страница 7: ...V Unless otherwise specified devices in this manual are referred to as the abbreviations above...
Страница 8: ......
Страница 105: ...www sungrowpower com Sungrow Power Supply Co Ltd...