9 Troubleshooting and Maintenance
User Manual
72
9.2.1 Routine Maintenance
Item
Method
Period
General state
of the system
Visual check for any damage or
deformation of the inverter.
Check any abnormal noise during
the operation.
Check each operation parameter.
Be sure that nothing covers the
heat sink of the inverter.
Every 6 months
Electrical
connection
Check whether there is damage to the
cables, especially the surface in contact
with metal.
6
months after
commissioning and
then once or twice a
year.
9.2.2 Replacing the Button Battery
Disconnect the inverter from the grid first, then the PV strings and the
battery before any maintenance work.
Lethal voltage still exists in the inverter. Please wait at least 10 minutes
and then perform maintenance work.
There is a button battery on the inner PCB board of the LCD. Contact the
SUNGROW Service Dept. for replacement when the relevant fault alarm
occurs.
Check the fastener, appearance, voltage, and resistance quarterly and
annually.