User Manual
46
3.
(Optional)
Install the copper
for the parallel mode with a
torque of 1.5 N
m.
4.
Connect the PV connectors to
corresponding terminals until
there is an audible click.
5.
Seal unused DC terminals with the terminal caps.
6.6 Communication Connection
There are four ports and a Wi-Fi terminal on the bottom of the inverter, as
shown in the following figure.
Backup Ctrl
Fig. 6-4
Communication Ports and Terminal
Ethernet function:
Through the Modbus TCP/IP protocol, the EMS or the Control Box from the
third party can fully control the on/off, derating, charging and discharging of
the inverter.
The inverter operation information can be transferred via
Ethernet
port. Visit
the Webserver and you can view the information.
The inverter operation information can be transferred to the iSolarCloud
server via the router.
Wi-Fi function:
With the WiFi module installed, visit the iSolarCloud App to view the inverter
information.