1-6
Sun Fire V1280/Netra 1280 Systems Installation Guide • May 2006
1.1.3
Preparing the Rails for Two-Post Installations
For two-post installations, you can dismantle and reassemble the rail assemblies
(
)
. The rail assemblies can be adjusted to suit a 19-inch two-post rack that
has a post depth in the range of 3 to 6 inches (7.5 to 15.0 cm).
1. Remove the nuts that secure the adjustable bracket and discard the adjustable
bracket (
2. Remove the four nuts securing the front bracket.
3. Rotate the front bracket 180 degrees and resecure it facing inward (
4. Remove the four nuts that secure the rear bracket.
5. Rotate the rear bracket 180 degrees so that it faces inward (
).
6. Align the rear bracket to the appropriate markings on the slide assembly and
resecure the rear bracket.
7. Repeat Step 1 through Step 6 for the second rail assembly.
FIGURE 1-3
Rail Assembly (Modified for Two-Post Installation)
2-Post 3" Position
2-Post 4" Position
2-Post 6" Position
Sunfire Cabinet
NGR Cabinet
Storedge Cabinet
Rear bracket
Front bracket
(facing inwards)
(facing inwards)
Slide assembly
Содержание Sun Fire V1280
Страница 6: ...vi Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...
Страница 10: ...x Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...
Страница 17: ...Chapter 1 Physical Installation 1 5 FIGURE 1 2 Spring Clips and Cutouts...
Страница 64: ...Index 2 Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...