1-32
Sun Fire V1280/Netra 1280 Systems Installation Guide • May 2006
1.6
Connecting Netra 1280 Power Cables
Note –
The following Netra 1280 procedures are intended as a guide only and
should only be performed by a qualified electrician.
This section contains the following topics:
■
“Assembling the Netra 1280 Power Connectors” on page 1-27
■
“Connecting the Netra 1280 Power Cables” on page 1-29
■
“Verifying the Power Input Connections Prior to the Initial Power Application”
on page 1-29
1.6.1
Assembling the Netra 1280 Power Connectors
Note –
The following procedure is intended as a guide only and should only be
performed by a qualified electrician.
1. Turn the power switch to the Standby position.
Caution –
The On/Standby power switch does not isolate the equipment. The
circuit breakers are the primary means of disconnection for this product.
2. Remove the plastic covers from the DC inlet box (
).
Each cover is retained by a Phillips no. 2 screw.
3. Assemble the earth connection.
a. Crimp the two-hole earth lug onto the earth cable.
The shipping kit contains lugs for crimping customer-supplied cables. Use a
crimping tool or approved equivalent to secure the lugs onto the cables.
b. Use two M5 nuts and washers to fit the lug to the location between the two
plastic covers using the M5 nut spinner provided.
4. Assemble the power cable ends.
a. Crimp the single-hole lugs onto the input and return cables.
b. Slide the lugs through the plastic cover.
Содержание Sun Fire V1280
Страница 6: ...vi Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...
Страница 10: ...x Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...
Страница 17: ...Chapter 1 Physical Installation 1 5 FIGURE 1 2 Spring Clips and Cutouts...
Страница 64: ...Index 2 Sun Fire V1280 Netra 1280 Systems Installation Guide May 2006...