Chapter 2
Preparing for Service
2-11
FIGURE 2-5
Removing Screws and Lifting the PCI Mezzanine
5. Lift the PCI mezzanine away from the chassis and place it on an antistatic mat.
You are now ready to replace components.
2.4
Field-Replaceable Units
FIGURE 2-6
and
TABLE 2-1
identifies the field-replaceable units (FRUS) in the server.
Содержание Netra T5220
Страница 1: ...Sun Netra T5220 Server Service Manual Part No E21359 02 January 2012...
Страница 14: ...1 4 Sun Netra T5220 Server Service Manual January 2012 FIGURE 1 1 Diagnostic Flowchart...
Страница 39: ...Chapter 1 Server Diagnostics 1 29 FIGURE 1 8 Flowchart of ALOM CMT CLI Variables for POST Configuration...
Страница 156: ...5 26 Sun Netra T5220 Server Service Manual January 2012...
Страница 171: ...Appendix A Signal Pinouts A 7...
Страница 172: ...A 8 Sun Netra T5220 Server Service Manual January 2012...