Chapter 5
Replacing Chassis Components
5-3
FIGURE 5-2
Installing the Air Filter and Closing the Bezel
5.2
Replacing a Power Supply
The server’s redundant hot-swappable power supplies enable you to remove and
replace a power supply without shutting the server down provided that the other
power supply is online and working.
The following LEDs are lit when a power supply fault is detected:
■
Front and rear Service Required LEDs.
■
Amber Failure LED on the faulty power supply
If a power supply fails and you do not have a replacement available, leave the failed
power supply installed to ensure proper air flow in the server.
Содержание Netra T5220
Страница 1: ...Sun Netra T5220 Server Service Manual Part No E21359 02 January 2012...
Страница 14: ...1 4 Sun Netra T5220 Server Service Manual January 2012 FIGURE 1 1 Diagnostic Flowchart...
Страница 39: ...Chapter 1 Server Diagnostics 1 29 FIGURE 1 8 Flowchart of ALOM CMT CLI Variables for POST Configuration...
Страница 156: ...5 26 Sun Netra T5220 Server Service Manual January 2012...
Страница 171: ...Appendix A Signal Pinouts A 7...
Страница 172: ...A 8 Sun Netra T5220 Server Service Manual January 2012...