64
Netra ct Server Installation Guide • September 2002
FIGURE 6-8
CPU Front Transition Card Location in a Netra ct 400 Server
2. Make the necessary cable connections to the CPU front transition card.
Tighten the screws on the cable to a torque of 0.23 N.m (2 in.-lb).
FIGURE 6-9
shows the connectors on the CPU front transition card for the Netra ct 800
server, and
FIGURE 6-10
shows the connectors on the CPU front transition card for the
Netra ct 400 server.
Note –
If you are cabling a front-access model of the Netra ct 400 server, use the
COM port on the CPU card as the TTY A port. Refer to Step 2 on page 59 for more
information.
ALARM
ETHERNET
CompactPCI
TM
COM
STATUS
READY
RESET
ABORT
microsystems
HDD0
HDD0
Содержание Netra ct
Страница 18: ...xviii Netra ct Server Installation Guide September 2002...
Страница 20: ...2 Netra ct Server Installation Guide September 2002...
Страница 36: ...18 Netra ct Server Installation Guide September 2002...
Страница 58: ...40 Netra ct Server Installation Guide September 2002...
Страница 168: ...A 150 Netra ct Server Installation Guide September 2002...