
38
Figure 2-26Assembly/Disassembly of Hard Disk Bracket
Step 3: Install the hard disk bracket in the reverse procedure. Pay attention to connecting the
hard disk with the mainboard closely during the installation.
2.2.7
Switch On/Off Power
This section mainly describes the power connection of the blade chassis and how to start and
shut down the blade system.
2.2.8
Power Connection
Insert the 220V power cord into the power interface in the back of the chassis, and the blade
system will start automatically.
[Note]
Connect the power supply, and it is necessary to initialize the management module. The
system will start automatically upon completion of the initialization.
2.2.9
Shut Down Blade System
Shut down the blade system by shutting down the blade server and switching off the chassis
power.
[Note]
When the operating system can't be shut down normally due to the operating system
abnormity of the CPU blade or other situations, you can shut down the CPU blade server by
pressing the Power button in the front panel of the CPU blade server for 6s, and wait for 30s at
least, so as to ensure the blade server is shut down.
After all CPU blade servers are shut down, disconnect all power cables.
Содержание TC6600
Страница 1: ...TC6600 U s e r s M a n u a l DAWNING INFORMATION INDUSTRY CO LTD ...
Страница 6: ...vi Combine with the use of dissipative static folding tool pad and portable field maintenance kit ...
Страница 12: ...xii 5 6 Remote Maintenance Firmware upgrade 115 Appendix Glossary 117 Appendix 2 Abbreviations 121 ...
Страница 19: ...xix ...
Страница 41: ...22 Figure 2 9Insertion Pull out of Management Module Insertion Pull out of Switching and Direct connect Module ...