30
Figure 2-18Open CPU Lock Lever
Step 3: Open the protective cover of CPU completely (don't touch the CPU and Socket pins). As
shown in
Figure 2-19
.
Figure 2-19Open Protective Cover of CPU
Step 4: Put the CPU into the CPU slot of the mainboard. Note that the golden triangle on the front
of CPU shall be placed in the position as shown in the figure below, so that the positioning key on
the slot is positioned in the groove of CPU. As shown in
Figure 2-20
.
Figure 2-20CPU Installation
Step 5: Close the upper cover of the CPU seat; clip the CPU seat in place; close the CPU fixing
cover, and buckle down the fixing lever to lock CPU. As shown in
Figure 2-21
.
Содержание TC6600
Страница 1: ...TC6600 U s e r s M a n u a l DAWNING INFORMATION INDUSTRY CO LTD ...
Страница 6: ...vi Combine with the use of dissipative static folding tool pad and portable field maintenance kit ...
Страница 12: ...xii 5 6 Remote Maintenance Firmware upgrade 115 Appendix Glossary 117 Appendix 2 Abbreviations 121 ...
Страница 19: ...xix ...
Страница 41: ...22 Figure 2 9Insertion Pull out of Management Module Insertion Pull out of Switching and Direct connect Module ...