
Site Planning Overview
1-2
Stratus ftServer 29x0, 49x0, and 69x0 Systems: Site Planning and Installation Guide
(R786)
Provide electrical power sources that meet the requirements of the system and
optional components, optionally including the purchase of a qualified
uninterruptible power supply (UPS).
Space planning
Provide adequate space for the system or cabinet and for a desk or table to
accommodate components outside a cabinet. Also provide enough space for
servicing the systems and components.
Provide an environment that meets the system’s requirements for ambient
temperature and air quality.
Provide sufficient network and analog telephone lines and plan the location of the
system and external components to accommodate the lengths of the connecting
cables.
Ensure that the power distribution units (PDUs) supply sufficient power to the
components you have purchased and that you have sufficient space available in
an appropriate cabinet.
Planning for peripheral components
Provide for the electrical, cooling, power, and space needs of any peripheral
components.
For information about obtaining documents related to your ftServer system, see
“System Documentation” on page 1-7
During the site planning and preparation processes, work closely with your facilities
group or contractor to determine space, power, and environmental requirements. Enlist
their help to provide a suitable location with sufficient alternating current (AC) power,
heating, ventilation and air conditioning (HVAC) capabilities, and network and
telephone connections.
If your system is covered by a service agreement and you need help with site planning,
contact the Stratus Customer Assistance Center (CAC) or your authorized Stratus
service representative. If you have a contract with the CAC or your authorized Stratus
service representative to install the system, contact them after you have prepared the
installation site and moved the system to the site. For more information about the CAC,
see
in the Preface or the
http://www.stratus.com/go/support
web site.
Содержание ftServer 2900 Series
Страница 10: ...Tables x Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 40: ...Planning for Cables 3 4 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 62: ...Monitor Requirements 6 6 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...