
Site Planning for Peripheral Components
7-1
Chapter 7
Site Planning for Peripheral
Components
7-
When planning a site for your ftServer system, consider the electrical, cooling, power,
and space needs of your peripheral components. Also consider which PCI adapters are
being installed, and the lengths of cables for the PCI adapters and peripheral
components.
This chapter contains the following information:
“ftScalable Storage System Requirements” on page 7-1
“Keyboard Requirements” on page 7-2
“Peripheral Components for Windows-based Systems” on page 7-3
“Peripheral Components for Linux-based Systems” on page 7-4
“Peripheral Components for VMware vSphere-based Systems” on page 7-5
N O T E
The system temperature and humidity requirements
defined in
are the
minimum
requirements the
site must provide. This chapter specifies the temperature
and humidity requirements for other components.
ftScalable Storage System Requirements
provides basic site-planning information for ftScalable Storage G3 systems.
You need some of this information to complete the worksheets in
.
Table 7-1. Site Planning for ftScalable Storage G3 Systems
Specification
Value
AC power (watts)
400
Nominal input voltage
100-240 VAC
Содержание ftServer 2900 Series
Страница 10: ...Tables x Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 40: ...Planning for Cables 3 4 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 62: ...Monitor Requirements 6 6 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...