
Installing a System Chassis
9-16
Stratus ftServer 29x0, 49x0, and 69x0 Systems: Site Planning and Installation Guide
(R786)
4. At the front of the cabinet, insert two cage nuts into each vertical rail in the locations
shown in
.
Figure 9-13. Cage Nut Locations on Front Vertical Rails
N O T E
To insert cage nuts, position the cage nuts so that the tabs
are on the top and bottom (
). Then insert the
cage nut so that the top tab on the cage nut overlaps the
vertical rails. Use a cage-nut insertion tool or your fingers
to pull the rest of the cage nut through so that the bottom
tab overlaps the vertical rail.
C A U T I O N
!
To avoid personal injury or damage to the shelf unit, two
persons are required to insert the shelf unit into the
cabinet and onto the mounting brackets.
M I S E E N G A R D E
!
Pour éviter toute blessure corporelle ou tout dommage à
l’étagère, deux personnes sont nécessaires pour insérer
l’étagère dans l’armoire et sur les supports de montage.
1U
1U
1U
1U
1
1
2
3
4
5
6
7
1
2
3
4
5
6
7
4U Total
Cage
Nu
t
Cage
Nu
t
Cage
Nu
t
Cage
Nu
t
dco057a
Ca
b
inet Front
V
ie
w
Содержание ftServer 2900 Series
Страница 10: ...Tables x Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 40: ...Planning for Cables 3 4 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 62: ...Monitor Requirements 6 6 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...