
Installing a System Chassis
9-20
Stratus ftServer 29x0, 49x0, and 69x0 Systems: Site Planning and Installation Guide
(R786)
11. Reinstall the front panel into the shelf unit as follows:
a. Align the front panel with the slot in the front right side of the shelf unit and push
it straight into the slot, as shown in
b. Tighten the captive thumbscrew (number 2 in
) at the bottom of the
panel.
Figure 9-17. Replacing the Front Panel in the Shelf Unit
1
Front panel
2
Captive thumbscrew
3
Bracket
2
3
1
peg043
Содержание ftServer 2900 Series
Страница 10: ...Tables x Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 40: ...Planning for Cables 3 4 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 62: ...Monitor Requirements 6 6 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...