
Grounding Requirements
2-10
Stratus ftServer 29x0, 49x0, and 69x0 Systems: Site Planning and Installation Guide
(R786)
Grounding Requirements
W A R N I N G
!
Incorrect grounding can cause severe personal injury and
extensive equipment damage.
A V E R T I S S E M E N T
!
Une mise à la terre incorrecte peut provoquer des
blessures graves et endommager sérieusement
l’équipement.
The ftServer system obtains its protective earth (PE) ground through the power cord.
See
“Grounding Considerations” on page B-1
for a more complete discussion of
ftServer system grounding.
Table 2-13. System Power (
Jumper
) Cables to Connect ftServer Systems to PDUs
Marketing ID
Plug Type to System
Rating
Length
Locale
B50502F
IEC 60320 C13 to IEC 60320 C14
10A/250V
6.6 ft (2m)
All
Содержание ftServer 2900 Series
Страница 10: ...Tables x Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 40: ...Planning for Cables 3 4 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 62: ...Monitor Requirements 6 6 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...