Strata CIX Programming Guidelines
Use Default Auto-programming to Start Up
Strata CIX Programming Vol.1 12/09
1-13
St
ra
ta
C
IX
Pr
og
ram
m
in
g
Review Program Flow
The basic program flow needed to set up the Strata CIX is shown below. The figure displays the most
critical programs in the left column and migrates right to optional programs. Also, programming flows from
specific (left) to general (right).
Card Assignment
(Program 100)
Create ILGs
(Program 304)
Create OLGs
(Program 306)
Planning the following
before proceeding:
Flexible Numbering Plan
(Program 102)
Trunk Group Access Plan
Station Range Plan
Create COS Plan (up to 32)
(Program 103)
Create DRL (up to 16)
(Program 111, 532 - 533)
Define FRL and QPL
meanings (up to 16)
Recommended*
* Planning these details in advance
enables Strata setup to proceed smoothly.
LS Trunks
GS Trunks
T1 Trunks
Tie Trunks
FX Trunks
PRI Trunks
BRI Trunks
DKT Stations
STD Stations
VM Ports
Attd Positions
Pilot DNs (ACD)
Door Phones
BRI Stations
Hunt Group
Paging Group
Call P.U. Group
Park Orbits
Paging Devices
Admin
Services
LCR / TR
System Program
SIP Stations
IP Stations
SIP Trunks
Содержание CIX 200
Страница 42: ...Network eManager 2 4 Strata CIX Programming Vol 1 12 09 ...
Страница 43: ...Network eManager Strata CIX Programming Vol 1 12 09 2 5 Network eManager ...
Страница 44: ...Network eManager 2 6 Strata CIX Programming Vol 1 12 09 ...
Страница 314: ...This page is intentionally left blank ...
Страница 432: ...This page is intentionally left blank ...
Страница 434: ...This page is intentionally left blank ...
Страница 468: ...This page is intentionally left blank ...
Страница 508: ...THIS IS THE LAST PAGE OF THE DOCUMENT ...