Operation
5
Assembling the articulated steering system (driving over ramps)
– Evenly tighten the clamping bolts on the
hinged tiller (tightening torque: 30 Nm)
and secure the clamping bolts with nuts
(tightening torque: 50 Nm).
NOTE
This tightening braces the tiller against the E
frame and provides protection against lateral
swivelling movements.
– Insert the hinged tiller on the second
articulated frame steering rig into the towing
jaws of the compensating hinge.
– Insert the coupling pin and lock it in place.
The illustration shows the hinged tiller with the
compensating hinge between two articulated
frame steering rigs.
The figure shows the hinged tiller when
loading and unloading is performed on the
left-hand side in the drive direction.
50988012117 [EN]
71
Содержание Tugger train Autarkic E Frame
Страница 2: ......
Страница 7: ...1 Foreword ...
Страница 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Страница 15: ...2 Introduction ...
Страница 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Страница 21: ...3 Safety ...
Страница 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Страница 29: ...4 Overviews ...
Страница 61: ...5 Operation ...
Страница 121: ...6 Servicing ...
Страница 132: ...6 Servicing Consumables 126 50988012117 EN ...
Страница 133: ...7 Technical data ...
Страница 142: ......
Страница 143: ......
Страница 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...