Operation
5
Commissioning the E frames
Checking the securing bolts for correct
function
– Move the ejector into the rear end position.
– The securing bolts (see arrow) must extend
at least 26 mm (locking position).
– When the foot pedal is actuated (no inter-
lock), the securing bolts must retract again.
Checking the securing system for correct
function
– Check if the trolley can roll out of the lowered
E frame despite the securing bolt being
extended.
50988012117 [EN]
75
Содержание Tugger train Autarkic E Frame
Страница 2: ......
Страница 7: ...1 Foreword ...
Страница 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Страница 15: ...2 Introduction ...
Страница 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Страница 21: ...3 Safety ...
Страница 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Страница 29: ...4 Overviews ...
Страница 61: ...5 Operation ...
Страница 121: ...6 Servicing ...
Страница 132: ...6 Servicing Consumables 126 50988012117 EN ...
Страница 133: ...7 Technical data ...
Страница 142: ......
Страница 143: ......
Страница 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...