5
Operation
Commissioning the autarkic E frames
– Push the trolley into the open side of the
E frame until it reaches the stop. The E
frame is raised by 40 mm and the trolley
wheels turn freely. A prerequisite for this is
sufficient pressure in the accumulator.
– When doing so, ensure that the securing
bolts (see arrow) are fully extended (locking
position) once the trolley has been inserted.
– The trolley is now secured against rolling
out.
Unloading the autarkic E frames
Unloading the autarkic E frames
DANGER
Risk of crushing when unloading the trolleys!
– Never unload on chamfers or gradients.
– When unloading the trolleys, ensure that there is
sufficient space to unload the trolleys safely and
to manoeuvre the trolleys safely.
– Depending on how heavily a trolley is loaded, the
driver must be prepared to exert an appropriate
amount of force to brake or steer the trolley, if
necessary.
WARNING
Risk of injury from becoming trapped!
– Loading and unloading must only be performed
by the driver. The driver must ensure that no
other persons are in the vicinity of the frames.
86
50988012117 [EN]
Содержание Tugger train Autarkic E Frame
Страница 2: ......
Страница 7: ...1 Foreword ...
Страница 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Страница 15: ...2 Introduction ...
Страница 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Страница 21: ...3 Safety ...
Страница 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Страница 29: ...4 Overviews ...
Страница 61: ...5 Operation ...
Страница 121: ...6 Servicing ...
Страница 132: ...6 Servicing Consumables 126 50988012117 EN ...
Страница 133: ...7 Technical data ...
Страница 142: ......
Страница 143: ......
Страница 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...