Operation
5
Assembling the articulated steering system (driving over ramps)
– Screw on the tab (see arrow) for the first
frame in the drive direction.
– Do not tighten the screws. The tab must be
loose.
NOTE
The welded-on ring on the tab (see arrow)
must be on the top. Rotate the tab if neces-
sary.
– Insert the rigid tiller into the tabs on the first
frame in the drive direction.
50988012117 [EN]
61
Содержание Tugger train Autarkic E Frame
Страница 2: ......
Страница 7: ...1 Foreword ...
Страница 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Страница 15: ...2 Introduction ...
Страница 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Страница 21: ...3 Safety ...
Страница 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Страница 29: ...4 Overviews ...
Страница 61: ...5 Operation ...
Страница 121: ...6 Servicing ...
Страница 132: ...6 Servicing Consumables 126 50988012117 EN ...
Страница 133: ...7 Technical data ...
Страница 142: ......
Страница 143: ......
Страница 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...