–
Do the same activities as for commission-
ing.
–
Check the fuel tank of the heating system
for condensation water and replace the fuel
if necessary.
–
Put the industrial truck into operation.
If the industrial truck is to be taken out of
operation for more than six months, contact
your authorised service centre for the course
of action required.
Scrapping the industrial truck
We recommend that this work is carried out by
an approved dismantler. However, if you wish
to do the work yourself, note the following:
–
Dismantle the industrial truck into as many
individual parts as possible and separate
them according to material for recycling.
–
Observe legal regulations regarding the dis-
posal of toxic substances, such as hydraulic
oil or batteries.
–
Follow the battery manufacturer's instruc-
tions for the disposal of old batteries.
NOTE
The operating company is responsible for any
breach of the legal regulations before, during
and after the dismantling and disposal of parts
of the industrial truck.
Operation
4
Decommissioning
252
50078078001 EN - 07/2022 - 04
Содержание LXT 120
Страница 2: ......
Страница 12: ......
Страница 13: ...1 Foreword ...
Страница 37: ...2 Safety ...
Страница 59: ...3 Overviews ...
Страница 62: ...Overviews 3 Display control unit 50 50078078001 EN 07 2022 04 ...
Страница 63: ...4 Operation ...
Страница 117: ...The softkey is also located in the Driving menu Operation 4 Lighting 105 50078078001 EN 07 2022 04 ...
Страница 265: ...5 Maintenance ...
Страница 285: ...6 Technical data ...
Страница 323: ......
Страница 324: ...STILL GmbH 50078078001 EN 07 2022 04 ...