4
Operation
Commissioning
Commissioning
Commissioning
If the vehicle is delivered only partially assem-
bled, ensure before commissioning that the
whole truck has been professionally assem-
bled. All hydraulic and electrical connections
have to be checked. The connections, which
must be disassembled for shipping should be
reassembled carefully. All nuts and bolts must
be tightened to the appropriate torque. After
the oil levels on the hydraulic tank and gear
box have been checked, commissioning can
begin. This commissioning should be done
professionally be our service personnel. Be-
fore starting work, work through the Checklist
before starting work.
Transporting and loading
ENVIRONMENT NOTE
Separating hydraulic connections can result in
the emergence of hydraulic oil.
Depending on the overall height, the truck
can be delivered as a complete unit or dis-
assembled. In each case, the weights of the
components or the complete unit must be de-
termined (delivery papers) and suitable hoists
and harnesses must be available.
32
5220 804 2501 [EN]
Содержание GX-Q
Страница 1: ...Original instructions GX X GX Q Turret truck 2201 5220 804 2501 EN 12 2012 ...
Страница 2: ......
Страница 6: ......
Страница 7: ...1 Foreword ...
Страница 15: ...2 Safety ...
Страница 25: ...3 Overview ...
Страница 36: ...3 Overview Functions 30 5220 804 2501 EN ...
Страница 37: ...4 Operation ...
Страница 64: ...4 Operation Parking and Decommissioning the truck 58 5220 804 2501 EN ...
Страница 65: ...5 Maintenance ...
Страница 76: ...5 Maintenance Battery check 70 5220 804 2501 EN ...
Страница 77: ...6 Technical Data ...
Страница 79: ...7 Optional Equipment ...
Страница 98: ......
Страница 99: ......
Страница 100: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 5220 804 2501 EN ...