
Maintenance schedule
Operation & maintenance instructions (Version H)
62
SKY-200/250
4.
Check the operation of the safety catches. With the lift in the highest position, one
person should operate the <unlock> button on the control box, while another should
check that the safety catch moves at the lifting devices.
Warning
w
Any hose which shows signs of age, damage, or distress must be replaced at once.
Hydraulic hoses are under very high pressure, and failure or malfunction could result
in personal injury and failure of hydraulic components. Consult your authorized
representative for proper fittings, hoses, or repairs.
7.2.3
Annual maintenance
The user should have the vehicle lift inspected annually. A maintenance contract can
be arranged with the service department for this annual inspection. If no
maintenance contract is arranged, the user should arrange for an annual inspection
and maintenance service himself.
This inspection is recorded in the inspection checklist.
The following activities must be carried out:
1.
Check as prescribed under daily and monthly (see operator manual).
2.
).
With the vehicle lift in the lowest position, the oil level in the tank of the hydraulic unit
should be above the line indicating the minimum level.
3.
When the oil level is too low, always carry out the following oil leakage checks.
4.
Check the hydraulic system for leakage. If the vehicle lift descends more than 1/4"
(6 mm) every hour, the system should be checked for external leakage (hoses,
couplings) and internal leakage (valves). Defective parts must be replaced.
5.
Check all protection in accordance with chapter
5 ’Taking into operation’ on page 55
.
6.
Check that the anchor bolt torque is in accordance with the data given in
.
7.
Check that the adjustment of the lock catch conforms to the specifications as
described in section
5.2 ’Locking mechanism’ on page 55
.
8.
Carry out a general check for damage. Where any construction parts show signs of
crack formation, such parts must be replaced. Damaged parts which can cause
dangerous situations to occur must be repaired or replaced immediately.
9.
Carry out lubrication activities as prescribed in section
.
10.
The LED lighting fixture contains a seal of PUR480. Inspect this seal every year for
any degradation of properties. Replace the lighting fixture if degradation is found.
For specific details see chapter
.
Содержание SKY-200
Страница 23: ...Safety Operation maintenance instructions Version H 23 SKY 200 250 2 Figure 2 3 Safety and warning labels ...
Страница 115: ...Figures and diagrams Operation maintenance instructions Version H 115 SKY 200 250 A Figure A 10 2 Control box ...
Страница 130: ...Dimensional drawing Operation maintenance instructions Version H 130 SKY 200 250 Figure A 14 2 Dimensional drawing ...
Страница 131: ...Figures and diagrams Operation maintenance instructions Version H 131 SKY 200 250 A Figure A 14 3 Dimensional drawing ...
Страница 134: ...Track lighting Operation maintenance instructions Version H 134 SKY 200 250 Figure B 1 2 Track lighting ...
Страница 152: ...Operation maintenance instructions Version H 152 SKY 200 250 ...
Страница 153: ......