
Assembling main parts
Operation & maintenance instructions (Version H)
46
SKY-200/250
4.5.4
Assembly of cable channels surface mounted version
1.
First mount the bottom channels (1) at the floor using the supplied anchors.
2.
Place the covers (2) at the stated positions.
3.
Fasten the covers (3) using the anchors. The covers (4) can be fastened below the
bolts (5).
4.5.5
Assembly of cable channels flush mounted version
1.
Fasten the covers (1) to the concrete using anchors.
2.
Fasten the covers (2) below the bolts (3). In case there is one great recess in the
floor, the supplied cable channels (4) and (5) can be used between the tracks.
Figure 4.16
Cable channels surface mounted version
Содержание SKY-200
Страница 23: ...Safety Operation maintenance instructions Version H 23 SKY 200 250 2 Figure 2 3 Safety and warning labels ...
Страница 115: ...Figures and diagrams Operation maintenance instructions Version H 115 SKY 200 250 A Figure A 10 2 Control box ...
Страница 130: ...Dimensional drawing Operation maintenance instructions Version H 130 SKY 200 250 Figure A 14 2 Dimensional drawing ...
Страница 131: ...Figures and diagrams Operation maintenance instructions Version H 131 SKY 200 250 A Figure A 14 3 Dimensional drawing ...
Страница 134: ...Track lighting Operation maintenance instructions Version H 134 SKY 200 250 Figure B 1 2 Track lighting ...
Страница 152: ...Operation maintenance instructions Version H 152 SKY 200 250 ...
Страница 153: ......