Bay size
Operation & maintenance instructions (Version H)
34
SKY-200/250
4.4
Bay size
Note
n
If a covering layer of mortar and/or tiles has been applied to the concrete floor, then
chemical anchors of sufficient length should be used. The anchors must be at least
that much longer than the thickness of the covering layer.
Note
n
Care should be taken for drainage of the bay area.
Note
n
It is the responsibility of the user to ascertain whether the quality of the concrete floor
is adequate.
Note
n
The required ceiling clearance must be: 69" + height of the vehicle to be rise
height of the jacking beams.
1.
To optimize shop space, first locate a vehicle in the bay prior to layout.
Note walkway's, escape path, overhead obstructions, and ability to move equipment
in the bay area.
Содержание SKY-200
Страница 23: ...Safety Operation maintenance instructions Version H 23 SKY 200 250 2 Figure 2 3 Safety and warning labels ...
Страница 115: ...Figures and diagrams Operation maintenance instructions Version H 115 SKY 200 250 A Figure A 10 2 Control box ...
Страница 130: ...Dimensional drawing Operation maintenance instructions Version H 130 SKY 200 250 Figure A 14 2 Dimensional drawing ...
Страница 131: ...Figures and diagrams Operation maintenance instructions Version H 131 SKY 200 250 A Figure A 14 3 Dimensional drawing ...
Страница 134: ...Track lighting Operation maintenance instructions Version H 134 SKY 200 250 Figure B 1 2 Track lighting ...
Страница 152: ...Operation maintenance instructions Version H 152 SKY 200 250 ...
Страница 153: ......