5
Operation & maintenance instructions (Version H)
55
SKY-200/250
5
Taking into operation
5.1
General
Before taking the vehicle lift into operation, the following checks must be carried out
by trained lift service personnel. There must be no vehicle on the vehicle lift.
Note
n
‘Trained lift service personnel’ refers to personnel of the Stertil-Koni service
department or another servicing agency recognized by Stertil-Koni, both also
designated as ‘service department’. The consequences of all repairs carried out on
the vehicle lift by non-trained lift service personnel, are entirely at the user's risk.
5.2
Locking mechanism
1.
Check that the locking catches (1) are free to engage all the teeth of the locking
strip (2).
Figure 5.1
Locking mechanism
Содержание SKY-200
Страница 23: ...Safety Operation maintenance instructions Version H 23 SKY 200 250 2 Figure 2 3 Safety and warning labels ...
Страница 115: ...Figures and diagrams Operation maintenance instructions Version H 115 SKY 200 250 A Figure A 10 2 Control box ...
Страница 130: ...Dimensional drawing Operation maintenance instructions Version H 130 SKY 200 250 Figure A 14 2 Dimensional drawing ...
Страница 131: ...Figures and diagrams Operation maintenance instructions Version H 131 SKY 200 250 A Figure A 14 3 Dimensional drawing ...
Страница 134: ...Track lighting Operation maintenance instructions Version H 134 SKY 200 250 Figure B 1 2 Track lighting ...
Страница 152: ...Operation maintenance instructions Version H 152 SKY 200 250 ...
Страница 153: ......