3.696.5275.210
48
Recommended Maintenance Schedule
Description
1
Month
3
Month
6
Month
12
Month
24
Month
Feed Tank
Remove and inspect temperature probe.
Refit and check calibration.
√
Remove and inspect level pressure transducer.
Refit with new gasket and check calibration.
√
Remove, strip and inspect, steam inlet control valve.
Replace all seals and refit with new gaskets.
√
Remove, strip and inspect water inlet control valve.
Replace all seals and refit with new gaskets.
√
Replace filter.
√
Remove and inspect primary steam coil.
Refit with new gasket.
√
Generator
Remove and inspect level transducer.
Refit and check calibration.
√
Remove and inspect pressure transducer.
Refit with new gasket and check calibration.
√
Remove, strip and inspect water inlet control valve.
Replace all seals and refit with new gaskets.
√
Remove, strip and inspect, steam inlet control valve.
Replace all seals and refit with new gaskets.
√
Check operation of EP5.
√
Remove, strip and inspect, bottom blow down control valve.
Replace all seals and refit with new gaskets.
√
Remove and inspect primary steam coil.
Refit with new gasket.
√
Remove, strip and inspect, clean steam outlet control valve.
Replace all seals and refit with new gaskets.
√
Remove and inspect generator air vent.
Refit with new gaskets.
√
General
Remove and inspect all steam traps.
Refit with new gaskets.
√
Remove and inspect all pressure gauges.
Refit with new gaskets.
√
Remove and inspect steam supply strainer screen.
Refit with new gasket.
√
Check conductivity of water in generator.
√
Carryout steam quality test.
√
Check all electrical connections.
√
Carryout full functional check, testing all alarms
and operating parameters are correct.
√
The pump comprises a maintenance free mechanical seal. Therefore there are no specific
maintenance requirements.
The Safety valve is factory set at a predetermined limit and requires no maintenance.
Содержание CSM-C
Страница 6: ...3 696 5275 210 2...