7. Examine the level probes/gauge for damage or incorrect positioning. For the exact
procedure for examination refer to the Spirax Sarco technical manual included with
the unit.
8. To install the level probe/gauge, align with the feed lines and start the fittings. Follow
recommendations contained in the documentation.
9. After ensuring that the level probe / gauge is correctly aligned, tighten the fittings.
10. Follow the start-up procedures to put the unit back on-line. Carefully check all
connections for any sign of leakage.
Fig. 25
Clean feed water pump - Inspection and Replacement
(Fig. 26)
The feed water pump is supplied on the Compact Steam Generator to supply the required
pressure to the feedwater to fill the generator , assuring that the unit will function safely
and effectively. If the pump must be removed for inspection, adjustment, or replacement,
follow the steps detailed below:
∆
Clean steam and primary source steam or superheated water present situations
that can be very dangerous because of the high temperatures and pressures. To
avoid possible injury or death and follow all accepted and recommended procedures
when performing installation, operation, and maintenance procedures.
∆
The combination of electricity, steam, and water can pose a very dangerous
situation. Turn off / disconnect all electric power before attempting any maintenance
procedures.
1. Follow the shutdown procedure to take the unit off-line before attempting any work on
the system.
2. Ensure that the primary supply, condensate / water return line, feed water inlet, and
clean steam outlet have been shut off; that the pressure has been bled from both the
clean steam and primary supply systems; that the vessel has been completely drained;
and that the steam, water, all components, and surfaces have cooled.
Level indicator