
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
55
Carrying out welding
Step 6:
Once a stud is in the stud retainer (a),
press the continuous flow button on the
feeder again to switch back to automatic
mode.
Step 7:
Check the stud feed hose for a correct and tight fit in the plug
connections of the stud welding gun or welding head and device.
Step 8:
Press either the reload button on the feeder (a)
or e.g. the release button on the welding gun (b)
until a welding stud is conveyed to the gun.
The function "Reload" can also be released by
the energy source connected or via a CNC
interface or welding head.
When reloading, a welding stud can be
pushed out of the gun or welding head. Hold guns or welding
heads with the stud ejectors facing downwards and do not point
them at persons or animals.
Step 9:
Ensure that the welding points on the stud and workpiece are metallically
bright.