
40
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
7.5
Replacing the outlet rail and rotating the stud retainer
Replacing the outlet rail and rotating the stud retainer
Step 1:
Turn off the mains switch on the device, disconnect the main air
supply and remove the cover hood.
Step 2:
Remove the hold-down plate with the fastening screw (a) above the
outlet rail.
Step 3:
Remove the stud retainer (a) and rotate the desired diameter to the
outlet rail (b).
To remove and insert the stud retainer, use a screw or a stud
with diameter M10 which you screw into the centre (c).
Remove the screw/stud again after inserting the barrel.
Step 4:
Loosen the fastening screws (a).