
28
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
6.6.3
Connections on the universal feeder
Connecting the universal feeder (rear side)
Step 1:
Supply air
Connect the main line of the compressed-air supply (a).
Observe the maximum permitted pressure.
Step 2:
Stud feed hose
Insert the stud feed hose into the connection piece (a) until the stop.
The stud feed hose and connection piece must match the stud
diameter being processed.
Step 3:
Mains connection
Check that the mains switch is turned off and after installation,
connect the feeder to the power supply using the mains plug.
You can find the mains plug in the hose package (a).
The device is connected.