
54
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
8.1
Starting the automatic system and carrying out welding
The following describes how weldings are carried out and how possible welding errors
can be avoided.
Danger from incorrect operation
A variety of hazards can occur while stud welding if the equipment is operated
incorrectly. Before using the devices, see chapter
“2 Important safety instructions”
from page 8.
If you have any problems understanding the operating instructions, contact the
manufacturer, SOYER
®
.
Please observe the operating instructions for the components used.
Carrying out welding
Step 1:
Before welding, see chapter
“2. Important safety instructions” from
page 8.
Step 2:
Connect the devices as described in chapter
connection diagram" on page 27.
Step 3:
Check or convert the universal feeder according to chapter
Converting the universal feeder
Step 4:
Fill the feeder bowl with welding studs.
Only use SOYER
®
welding studs.
Observe the permitted filling weight.
Step 5:
Push the continuous load button (a) on the feeder.
The studs are transported to the stud retainer.