
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
47
Replacing the connection piece for the stud feed hose and rotating the stud retainer
(UVR-400 universal feeder)
Step 7:
Attach the correct hose connection (a) with the fastening screws (b)
above the escapement.
Align the hose connection (a) with the position of the stud retainer.
Ensure that there is a clean, aligned transition. It is helpful if a stud is
already inserted in the stud retainer for this purpose. This makes it
easier to determine a central positioning.
Risk due to accelerated welding studs
Before adjusting the hose connection, make sure that the device is not
connected to the compressed air supply.
Step 8:
Attach the cover panel (a) with the fastening screws (b) above the
escapement. To do this, push the cover panel (a) in the direction of the
hose connection (c) until the stop.