M11 Installation, Maintenance, Service, & Part List Manual
6.
Make sure that the door openings along the transportation path are adequate for the
machine to go through.
7.
For Front or Rear pickup; roll the pallet jack under the machine (roughly centered), as far
as possible. Make sure that the pallet jack rails will positively support the front and rear
structural cross-members of the base casting. From the Right or left side pickup, roll the
pallet jack all the way as far as possible, where indicated on the side of the machine, to
properly balance the machine load.
8.
Lift the machine about 1/2-3/4 inches off the floor.
Note: never push or pull
machine using the door handle.
While pulling, pushing and steering, monitor the
movement of the machine to make sure that it does not run into or catch on anything
during transportation. Carefully move the machine to the new location.
9.
Once at the new location,
Slowly and Carefully
lower the machine down to the floor,
and stow away the pallet jack.
10.
Connect the electrical power cord, compressed air hose, and any other accessories
disconnected before the move.
11.
Power up the machine and check machine’s tram, if necessary,
adjust the machine
leveling feet to achieve the desired tram result. All four legs must touch the floor.
3.11 Cutting the Euclid Test Block
The test part may be machined at the completion of the installation. (see figure 3.11)
Material Specification: Aluminum, 6061-T6 or T4
Blank Size: (minimum dimensions) 3 x 3 x 1”
Tool:
½”
end mill, 2 flute, high speed steel,
sharp
Coolant: Flood coolant
1.
Mount vise and indicate the back jaw parallel to the table within .0005”. Use fixture vise
plate if customer ordered this option.
2.
Clamp material in vice with a minimum of 0.800” above the vise jaws.
3.
Load in the Euclid block program into the ProtoTRAK TMX C drive, it is part number
99999998.PT4.
4.
Use an edge finder to set your offsets for X, Y and Z. Absolute zero is the front left
corner of the block as viewed from in front of the machine.
5.
Go to the tool table and set the Z offset height for your tool.
6.
Load this tool into the spindle.
7.
Press the AUX button to turn the coolant on if you are going to use flood coolant.
8.
Begin to run the program by pressing RUN, START and GO. The part will be machined in
the following sequence:
Description
Depth of
Cut
circle pocket
–
cuts middle circle
circle frame
–
cuts outer 1.830 diameter circle
circle frame
–
cuts material from corners remaining
on Euclid block
roughs material in upper right-hand corner
cuts triangle on Euclid block
rectangular frame
–
cuts outer 2.750” rectangle
position to 1.318 on X and Y
-
0.250”
-
0.250”
-
0.250”
-
0. 500”
-0.
500”
-
0.750”
+10.000”
Содержание TRAK 2OP M11
Страница 6: ...3 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 7: ...4 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 8: ...5 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 12: ...9 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 71: ...68 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...