
18
Southwestern Industries, Inc.
TRAK
2
OP
M11 Installation, Maintenance, Service, & Part List Manual
3.0 Installation
3.1 Lifting the 2 OP Mill
The 2 OP mill must be lifted and/or moved from the pallet with a forklift with a minimum capacity
of 5,000 lbs. Make sure the forks extend all the way through the machine if lifted from the
front, side or rear.
Figure 3.1a
Figure 3.1b
Содержание TRAK 2OP M11
Страница 6: ...3 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 7: ...4 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 8: ...5 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 12: ...9 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 71: ...68 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...