131
Southwestern Industries, Inc.
TRAK
2
OP
M11 Installation, Maintenance, Service, & Part List Manual
6.17 Home Switch Replacement
The 2 OP machine has 3 home switches which are used to home the machine.
1.
Depending on which switch you need to replace or adjust, you may need to move the machine to
gain clearance. For the X axis, it is best to move the head all the way to the left. For the Y axis,
move the table towards the rear of the machine. For the Z axis, it may be easiest to move the
head down toward the table.
2.
Turn power off to the machine.
3.
See drawing 27658-1 for an illustration of where each home switch is mounted.
4.
Remove all sheet metal covers necessary to gain access to the switches.
5.
The switches are held in place with a few screws.
6.
It is very important to place the new switch in the same location as the old one so the home of
the machine will stay the same.
7.
Replace all covers and sheet metal as necessary.
Caution!
If the home of the machine changes, various parameters will need to be reset. Important machine
parameters such as ball lock locations (service code 500), tool change height, ATC locations (service code
520) will need to be reset if the home has changed.
6.18
Spindle Motor Encoder Replacement
1.
Remove Encoder housing cover to gain access to internal connections.
Содержание TRAK 2OP M11
Страница 6: ...3 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 7: ...4 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 8: ...5 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 12: ...9 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Страница 71: ...68 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...