
-16-
For Machines Mfd. Since 02/21
South Bend Tools
Model SB1097
P R E P A R A T I O N
Lifting & Moving
Do not attempt to lift this machine without using
the proper lifting equipment (such as forklift or
crane) rated for at least 750 lbs. to support the
dynamic loads that may be applied while lifting.
This machine and its
parts are heavy! Serious
personal injury may occur
if safe moving methods are
not used. To reduce the
risk of a lifting or dropping
injury, ask others for help
and use power equipment.
Figure 15. Lifting locations.
Figure 15. Lifting locations.
To lift and move machine:
1.
Loosen platen tilt lock handle and tilt
platen until tilt pointer points to 90
°
(see
Figure 13).
Figure 13. Platen tilt lock handle location.
Figure 13. Platen tilt lock handle location.
Platen Tilt
Platen Tilt
Lock Handle
Lock Handle
Pointer
Pointer
4.
Close cabinet door.
5.
Use lifting straps to lift machine off pallet at
lifting locations shown in Figure 15.
2.
Open cabinet door and remove loose parts.
6.
Move machine to desired location.
7.
For anchoring to floor or placing on machine
mounts (not included), refer to Page 17.
Note:
Remove the cabinet bottom shown in
Figure 14 to access machine mounting holes.
3.
Remove Phillips head screws and washers
shown in Figure 14 to remove fence.
Figure
Figure 14. Fence secured inside cabinet for shipping.
. Fence secured inside cabinet for shipping.
x 2
Removable
Removable
Bottom
Bottom
Fence
Fence
Содержание SB1097
Страница 60: ...southbendtools com Printed In Taiwan CS21567 ...