PREPARATION
-10-
For Machines Mfd. Since 02/21
South Bend Tools
Model SB1097
P R E P A R A T I O N
Preparation Overview Required for Setup
The purpose of the preparation section is to help
you prepare your machine for operation. The list
below outlines the basic process. Specific steps
for each of these points will be covered in detail
later in this section.
The typical preparation process is as follows:
1.
Unpack the machine and inventory the
contents of the box/crate.
2.
Clean the machine and its components.
3.
Identify an acceptable location for the
machine and move it to that location.
4.
Level the machine and either bolt it to the
floor or place it on mounts.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6.
Connect the machine to the power source.
7.
Test run the machine to make sure it
functions properly and is ready for operation.
The items listed below are required to
successfully set up and prepare this machine for
operation.
For Lifting
• A forklift or other power lifting device rated
for the weight of the machine.
• Lifting Straps (rated for at least 750 lbs.)
For Power Connection
• A power source that meets the minimum
circuit requirements for this machine. (Refer
to the Power Supply Requirements
section for details.)
• A qualified electrician to ensure a safe and
code-compliant connection to the power
source.
For Assembly
• Disposable Rags
• Cleaner/Degreaser
• Disposable Gloves
• Safety Glasses
• Phillips Head Screwdriver #2
• Floor Mounting Hardware (As Needed)
• Wrench or Socket
1
⁄
2
"
• Rubber Mallet
• Dust Hoses 4" (2)
• Hose Clamps 4" (2)
• Dust Collection System
• Open-End Wrench 22mm
Содержание SB1097