WARNING!
The inverter must be configured to the proper setting in order to ensure
that it complies with the country grid code and functions properly with the
country grids.
3. From the
Language
drop-down list, select the language.
4. Tap
Set Language
.
Pairing
Once all connections are made, all the power optimizers must be logically paired to
their inverter. The poweroptimizers do not start producing power until they are paired.
This step describes how to assign each inverter to the poweroptimizers from which it
will produce power.
Perform this step when the modules are exposed to sunlight. If the string length is
changed or a power optimizer is replaced, repeat the pairing process.
1. From the main menu, select
Pairing
.
2. Tap
Start Pairing
.
3. When Pairing Complete is displayed, the system startup process begins:
Since the inverter is ON, the power optimizers start producing power and the
inverter starts converting AC.
WARNING!
When you turn ON the inverter ON/OFF/P switch, the DC cables carry a
high voltage and the power optimizers no longer output a safe 1V output.
When the inverter starts converting power after the initial connection to the AC,
the inverter enters Wakeup mode until its working voltage is reached. This mode
is indicated by the flickering green inverter LED.
When working voltage is reached, the inverter enters Production mode and
produces power. The steadily lit green inverter LED indicates this mode.
4. Tap
OK
to return to the main menu.
Communication
Communication settings can be configured only after communication connections
are complete. Refer to
Setting Up Communication on page 61.
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp