Figure 5: Power optimizers connected in series
3. If you intend to monitor the installation, using the SolarEdge monitoring platform,
record the physical location of each power optimizer, as described in
Logical and Physical Layout using Installation Information on page 59.
Step 4: Verifying Proper Power Optimiser
Connection
When a module is connected to a power optimizer, the power optimizer outputs a
safe voltage of 1V (±0.1V). Therefore, the total string voltage should equal 1V times
the number of power optimizers connected in series in the string. For example, if 10
power optimizers are connected in a string, then 10V should be produced.
Make sure the PV modules are exposed to sunlight during this process. The power
optimizer will only turn ON if the PV module provides at least 2W.
In SolarEdge systems, due to the introduction of poweroptimizers between the PV
modules and the inverter, the short circuit current I
SC
and the open circuit voltage
V
OC
hold different meanings from those in traditional systems.
For more information about the SolarEdge system’s string voltage and
current, refer to the
V
OC
and I
SC
in SolarEdge Systems Technical Note,
available on the SolarEdge website at:
https://www.solaredge.com/sites/default/files/isc_and_voc_in_solaredge_sytems_
.
Chapter 2: Installing the Power Optimizers
19
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2