Creating Logical and Physical Layout using Installation
Information
To display a logical layout, insert the inverterserial number in the new site created in
the monitoring platform. When the communication between the inverter and the
monitoring server is established, the logical layout is displayed.
To display a physical layout, you need to map the locations of the installed power
optimizers. To map the locations, use one of the methods described in the next
sections.
Designer
Designer recommends inverter and power optimizer selection per site
size and enables report generation.You can create a project in
Designer and export the site design with the string layout to the
monitoring platform.
For more information, refer to
https://www.solaredge.com/products/installer-
Mapper Application
Use the Mapper smart phone application to scan the power optimizer and inverter 2D
bar-codes and create a virtual map of a PV site for enhanced monitoring and easier
maintenance.
Th Mapper application is integrated with the monitoring platform and enables:
Simple on-site registration of new systems.
Creating, editing and verifying system physical layout.
Scanning and assigning the power optimizer serial number to the correct
module in the system physical layout.
For detailed information, refer to the
Mapper demo movies:
Creating new sites using the Mapper mobile application
Mapping existing sites using the Mapper mobile application
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp
59
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2