ON (1)
- Turning this switch ON (after optimizer pairing) starts the
operation of the power optimizers, enables power production and
allows the inverter to begin exporting power to the utility grid.
OFF (0)
- Turning this switch OFF reduces the power optimizer voltage
to a low safety voltage and inhibits exportation of power. When this
switch is OFF, the Primary and Secondary Units' control circuitry
remains powered up.
P
- Moving and releasing the switch allows viewing system information
via the LEDs and on the SolarEdgeSetApp mobile application screen
and performing functions:
P Position duration
Function
Comments
Switch moved to P for
less than 5 seconds
,
then released.
Displays production
information for 5 seconds
on the SetApp screen.
Displays error type
indications (if exist) for 5
seconds.
Activates the Wi-Fi access
point for connecting to the
SolarEdge Inverter
SetApp
While the
switch is in P,
all LEDs are
ON
Switch moved to P for
more than 5 seconds
,
then released.
Starts pairing
WARNING!
Upon PVRSS, the internal circuitry remains up, therefore the inverter
cover must be opened only after shutting off the inverter ON/OFF
switch. This disables the DC voltage inside the Primary Unit. Wait five
minutes before opening the cover. Otherwise, there is a risk of electric
shock from energy stored in the capacitors.
LEDs
Chapter 3: Installing the Primary and Secondary Unit(s)
23
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2