![SolarEdge SE100KUS Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/solaredge/se100kus/se100kus_installation-manual_1313727053.webp)
Site Status
The Site status screen shows the accumulated status of all inverters connected to a
master inverter in a chain (bus) and the master inverter status.
For inverters with secondary units, the status of secondary units is displayed on the
screen. If a secondary unit is not operating, its column is grayed-out.
-
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2
52
Viewing System Status