3 INSTALLATION
3.1 PREPARATION
It is appropriate for easy and quick installation that the installation and the first start-up of the
barfeeder should be carried out by the manufacturer's technician or a by a person authorized
by the manufacturer. It is in the user's interest to ensure presence of the barfeeder operation
and maintenance staff during installation in order for them to be familiarized with the
principles of the barfeeder use in collaboration with the lathe. Furthermore, it is necessary to
prepare and check the following items before installation.
1. Lathe
•
The lathe should be anchored to ground to eliminate its eventual motion in relation to
the barfeeder.
•
The lathe must be equipped with a suitable electric interface for the barfeeder with a
magazine.
•
The lathe must have automatic clamping device (a collect or chuck).
•
The clamping device should clamp by the motion of the pull tube backwards (to the
barfeeder). Otherwise it is not possible to feed the bar to a position (SS2400S).
•
If functional check of the barfeeder is required on a real part, the lathe must be
prepared for the part production with debugged NC program, and must be equipped
with necessary tools.
•
The lathe must be free on the installation day. Neither production nor program
debugging can take place on it.
If you want to feed bars to a programmed position (without stopper) it is
necessary that the clamping device clamps the material by motion of the
pull tube backwards (from the lathe to the barfeeder).
2. Spindle inserts
It is the user's responsibility to ensure centring spindle inserts for the bars to be machined on
the lathe in start of production. Some lathe manufacturers deliver these inserts within
accessories. You can find detailed information on the spindle inserts in Chapter 4.3.
3. Bar stock for testing
The user must prepare a bar stock for the trial run of the barfeeder in installation (cut the
bars to an appropriate length).
4. Foundations
Barfeeder foundations must be of high-quality concrete. Barfeeder legs shall be fastened in
the concrete by anchor bolts. The foundations must provide sufficiently strong connection of
the lathe and the barfeeder without transfer of vibration.
Note:
Before installation it is suitable to carry out the last inspection of completion of the
preparatory work and to inform the installation personnel of its result in order to prevent from
wastage in consequence of unexpected problems that may occur before installation.
Содержание SPACESAVER 2400S
Страница 2: ......
Страница 8: ...Table of Contents 8 SS2400T S...
Страница 17: ...Chapter 1 Description SS2400T S 1 7...
Страница 18: ......
Страница 23: ...Chapter 3 Installation SS2400T S 3 3 3 2 3 GEOMETRIC ALIGNMENT WITH THE LATHE 6 Fig 3 2 Setting Kit...
Страница 75: ...Chapter 5 Maintenance SS2400T S 5 13 5 3 6 WIRING DIAGRAMS...
Страница 76: ...Chapter 5 Maintenance 5 14 SS2400T S...
Страница 77: ...Chapter 5 Maintenance SS2400T S 5 15...
Страница 78: ...Chapter 5 Maintenance 5 16 SS2400T S...
Страница 79: ...Chapter 5 Maintenance SS2400T S 5 17...
Страница 80: ...Chapter 5 Maintenance 5 18 SS2400T S...
Страница 81: ...Chapter 5 Maintenance SS2400T S 5 19...
Страница 82: ...Chapter 5 Maintenance 5 20 SS2400T S...
Страница 83: ...Chapter 5 Maintenance SS2400T S 5 21...
Страница 84: ...Chapter 5 Maintenance 5 22 SS2400T S...