c12 volt red wire of the black box under ignition key, insert the protective fuse on the cable in a way
that it can be easily inspected.
Insert the plugs of the 4 limit switches into the receiver box manually checking the correct sequence: front left – front
right – back left –back right with the red LEDs on the electric panel.
Once hydraulic tubes and electrical wiring cables have been lodged under the chassis with cable ties and you have
checked that all the fittings with washers have been tightened the system can be started up.
Fill the tank with hydraulic oil checking the level visually, then levelling can be started.
In the initial work phase of the jacks you will notice a jerking movement in the jack because of the air inside the jack.
danger!
During this operation it is imperative that you do not stand close to the jacks, because if the fittings have not
been properly assembled pressurised liquid could be sprayed out.
Continue topping up with oil until all the jacks have come to the end run.
The bleeding of air takes place automatically after the first complete cycle of the system.
At this point retract all the jacks and verify the oil level; top up, if necessary.
MAX.
Содержание MULTI-LIFT SYSTEM
Страница 22: ...22 SIMPLIFIED ELECTRIC DIAGRAM ...
Страница 24: ...24 DOUBLE EFFECT TELESCOPIC JACKS ...
Страница 25: ...25 DOUBLE EFFECT EASYHUB ...
Страница 26: ...26 HEAVY JACKS ...
Страница 28: ...28 HYDRAULIC TUBE FITTING ...
Страница 29: ...29 HYDRAULIC SCHEME ...
Страница 30: ...30 CONNECTING HYDRAULIC TUBES ...
Страница 32: ...32 DIMENSIONS ...
Страница 49: ...49 5 6 7 8 3 5 4 5 6 ...
Страница 53: ...53 ...