31
CONNECTING HYDRAULIC TUBES
When assembling tubes be careful not to confuse the various connections.
A double effect jack corresponds to each block.
All the tubes that go on the lower part of the jacks must be connected on the operating side of the emergency pump.
All the tubes that go on the upper part of the jacks must be connected on the opposite side.
You are advised to number the tubes corresponding to the jacks (example 1-2/3-4/5-6/7-8).
Содержание MULTI-LIFT SYSTEM
Страница 22: ...22 SIMPLIFIED ELECTRIC DIAGRAM ...
Страница 24: ...24 DOUBLE EFFECT TELESCOPIC JACKS ...
Страница 25: ...25 DOUBLE EFFECT EASYHUB ...
Страница 26: ...26 HEAVY JACKS ...
Страница 28: ...28 HYDRAULIC TUBE FITTING ...
Страница 29: ...29 HYDRAULIC SCHEME ...
Страница 30: ...30 CONNECTING HYDRAULIC TUBES ...
Страница 32: ...32 DIMENSIONS ...
Страница 49: ...49 5 6 7 8 3 5 4 5 6 ...
Страница 53: ...53 ...