Installation Flowchart
VII
Basic Installation Flowchart
Has the transmitter
been configured
in bench for the
application ?
Configure the transmitter
( section 1 and section 3).
Start
Field Installation.
Install the transmitter in protected
areas from weather proof.
Install the transmitter (mechanically
and electrically) according to the
application, verifying the most
appropriate position of the LCD.
Network installation must be
according to IEC61158-2
recomendations (Section 4).
Verify area classification and
its respective practices.
No
Yes
Configure the measuring
to 0% and 100% ( Section 3 ).
range
Configure Fail Safe value
( Section 3 ).
Configure Damping ( Section 3 ).
Configure the indication in LCD
( Section 3 ).
Apply pressure.
Is the measurement
OK ?
Consult the manual (section 4)
- Maintenance.
No
Yes
Power the transmitter appropriately.
Is the engineering
unit wrong?
value
Is it solved ?
Do the
Trim.
Zero
No
No
No
Yes
Yes
Yes
Is
?
the
measuring wrong
Does it have wet leg?
OK
No
Yes
Configure the physical device
address (Section 3).
Using the GSD file, configure the
cyclic data in the system configuration
tool (Section 3)
Содержание LD303
Страница 1: ...Profibus PA Pressure Transmitter L D 3 0 3 M E...
Страница 8: ...LD303 Operation and Maintenance Instruction Manual VIII...
Страница 15: ...Installation 1 7 Figure 1 1 f Dimensional Drawing and Mounting Position Sanitary Transmitter with Extension...
Страница 22: ...LD303 Operation and Maintenance Instruction Manual 1 14...
Страница 26: ...LD303 Operation and Maintenance Instruction Manual 2 4...
Страница 49: ...Configuration 3 23 Figure 3 24 Block Mode for Totalizer Block Figure 3 25 Set Reset for Totalizer Block...
Страница 74: ...LD303 Operation and Maintenance Instruction Manual 4 6 Figure 4 4 Exploded View...
Страница 83: ...Maintenance Procedures 4 15 Figure 4 8 TPE Software Screen...
Страница 102: ...LD303 Certifications Information A 4 CSA NEMKO and EXAM CEPEL NEPSI...
Страница 104: ...LD303 Certifications Information A 6 CEPEL...
Страница 105: ...Appendix A A 7 Control Drawing Factory Mutual FM...
Страница 106: ...LD303 Certifications Information A 8...
Страница 108: ...LD303 Operation and Maintenance Instruction Manual B 2...