Appendix A
A.1
CERTIFICATIONS INFORMATION
European Directive Information
Authorized representative in European Community
Smar Gmbh-Rheingaustrasse 9-55545 Bad Kreuzanach
PED Directive (97/23/EC) – Pressure Equipment Directive
This product is in compliance with the directive and it was designed and manufactured in
accordance with sound engineering practice using several standards from ANSI, ASTM, DIN and
JIS.
EMC Directive (2004/108/EC) - Eletromagnetic Compatibility
The EMC test was performed according to IEC standard: IEC61326-1:2006, IEC61326-2-3:2006,
IEC61000-6-4:2006, IEC61000-6-2:2005. For use in environment only.
Keep the shield insulated at the instrument side, connecting the other one to the ground if necessary
to use shielded cable.
ATEX Directive (94/9/EC) – Equipment and protective systems intended for use in potentially
explosive atmospheres.
This product was certified according European Standards at NEMKO and EXAM (old DMT). The
certified body for manufacturing quality assessment is EXAM (number 0158).
LVD Directive 2006/95/EC – Electrical Equipment designed for use within certain voltage
limits
According the LVD directive Annex II the equipment under ATEX “Electrical equipment for use in an
explosive atmosphere” directive are excluded from scope from this directive.
Other Approval
Sanitary Approval
Certifier Body: 3A Sanitary Standards
Model Designations: LD303 with or without extension
Sensors and Sensor Fittings and Connections Used on Fluid Milk and Milk Products,
Number: 74-03. (Authorization No. 873).
Documents for manuals
•
Label Plate: 101A-1797
IP68 Report:
Certifier Body: CEPEL
Tests for Ingress Protection IP68 – CEPEL DVLA – 7390/05C
This report not apply to harzardous locations Ex d protection and with Drawing 101B-4740-00.
For guarantee the ingress of protection IP68 in the electrical connection input with NPT thread
must be applied a threadlocker like Loctite 262.
Documents for manuals:
•
Label Plate: 101A-8823
Hazardous Locations Certifications
NOTE
The IP68 sealing test (immersion) was performed at 1 bar for 24 hours. For any other situation,
please consult Smar.
Содержание LD303
Страница 1: ...Profibus PA Pressure Transmitter L D 3 0 3 M E...
Страница 8: ...LD303 Operation and Maintenance Instruction Manual VIII...
Страница 15: ...Installation 1 7 Figure 1 1 f Dimensional Drawing and Mounting Position Sanitary Transmitter with Extension...
Страница 22: ...LD303 Operation and Maintenance Instruction Manual 1 14...
Страница 26: ...LD303 Operation and Maintenance Instruction Manual 2 4...
Страница 49: ...Configuration 3 23 Figure 3 24 Block Mode for Totalizer Block Figure 3 25 Set Reset for Totalizer Block...
Страница 74: ...LD303 Operation and Maintenance Instruction Manual 4 6 Figure 4 4 Exploded View...
Страница 83: ...Maintenance Procedures 4 15 Figure 4 8 TPE Software Screen...
Страница 102: ...LD303 Certifications Information A 4 CSA NEMKO and EXAM CEPEL NEPSI...
Страница 104: ...LD303 Certifications Information A 6 CEPEL...
Страница 105: ...Appendix A A 7 Control Drawing Factory Mutual FM...
Страница 106: ...LD303 Certifications Information A 8...
Страница 108: ...LD303 Operation and Maintenance Instruction Manual B 2...