SKYJACK, Page 23
April 2006
SJIII Series E - CONVENTIONALS
Section 2 - Operation
Setup Procedure
16. From the base controls, carefully raise the
on how to raise the platform.
17. Unlatch and carefully swing down the
procedure to properly position the maintenance
support.
Warning
The maintenance support must be used during
inspection and maintenance or repairs are to be
performed within the lifting mechanism.
Failure to avoid this hazard could result
in death or serious injury.
18. From the base controls, carefully lower the
platform until the scissor assembly is firmly resting
on the maintenance support. For procedure on
how to lower the platform refer to
19. Inspect all hoses, fittings, wires, cables, valves,
etc. for leaks, loose or missing parts, hidden
damage and foreign material.
20. Raise the platform until there is an adequate
clearance to swing up maintenance support and
lock in position.
21. Raise the platform to the maximum extension
height.
Warning
Be aware of overhead obstructions or other possible
hazards around the machine when lifting.
22. Fully lower the platform.
Содержание 6826El
Страница 47: ...MOBILE ELEVATING PLATFORMS www skyjackinc com ...