April 2006
SJIII Series E - CONVENTIONALS
SKYJACK, Page 5
Table of Contents
Section 2 - Continued
2.4 Setup Procedure .............................................................................................................................................. 22
2.5 Start Operation ................................................................................................................................................. 24
2.5-1 Pre-Start Inspection .......................................................................................................................... 24
2.5-2 Operator’s Checklist ......................................................................................................................... 24
2.5-3 To Raise the Platform using the Base Controls .................................................................................25
2.5-4 To Lower the Platform using the Base Controls ................................................................................ 25
2.5-5 To Raise the Platform using the Operator’s Control Box ................................................................... 25
2.5-6 To Lower the Platform using the Operator’s Control Box ..................................................................26
2.5-7 To Drive Forward or Backward .......................................................................................................... 27
2.5-8 To Steer ............................................................................................................................................. 27
2.5-9 To Extend/Retract Manual Extension Deck ....................................................................................... 27
2.5-10 To Extend/Retract Powered Extension Deck (If Equipped) ............................................................... 28
2.5-11 Hydraulic Outriggers (If Equipped) ................................................................................................... 28
2.5-11a Before Operation ........................................................................................................ 28
2.5-11b Extending the Outriggers ............................................................................................ 28
2.5-11c Retracting the Outriggers ........................................................................................... 29
2.8 Emergency Lowering Procedure ...................................................................................................................... 33
2.9 Battery Maintenance ........................................................................................................................................ 34
2.10 Tables ............................................................................................................................................................... 38
2.11 Labels ............................................................................................................................................................... 43
List of Tables
Table 2-1. Specifications and Features ...................................................................................................................... 38
Table 2-2. Owner’s Annual Inspection Record ........................................................................................................... 39
Table 2-3. Floor Loading Pressure ............................................................................................................................. 40
Table 2-4. Maximum Platform Capacities (Evenly Distributed) ................................................................................... 42
Table 2-5. Maintenance and Inspection Schedule ..................................................................................................... 43
Содержание 6826El
Страница 47: ...MOBILE ELEVATING PLATFORMS www skyjackinc com ...